You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Civil Engineering

Images Map
BBI Airport, Berlin Brandenburg, Germany - Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.

BBI Airport, Berlin Brandenburg, Germany

Structural work for passenger terminal completed in only one year

Berlin, Germany

Bridge over the Dunajec, Tarnow, Poland - With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method.

Bridge over the Dunajec, Poland

Cantilevered construction solution on the basis of the VARIOKIT engineering construction kit

Tarnow, Poland

Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.

Capitol Hill Station, United States of America

System-based project solution saves time and money

Seattle, United States

Citytunnel Malmö, Sweden - The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km.

Citytunnel Malmö, Sweden

Cost-effective combination of formwork carriage construction and rentable system parts

Malmö, Sweden

Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.

Deer crossing bridge Zehun, Czech Republic

Perfect match of formwork and shoring fast delivered

Zehun, Czech Republic

Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.

Lanaye Lock Bridge, Belgium

Realization of lock bridge with VARIOKIT construction kit

Lanaye, Belgium

Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.

Satellite (Terminal Expansion) Munich Airport, Germany

Comprehensive range of services for construction and scaffolding companies

Munich, Germany

The Squaire, Frankfurt am Main, Germany - PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.

The Squaire, Germany

Competent engineering and logistical services

Frankfurt am Main, Germany

Traffic junction Siekierkowska roadway, Warsaw, Poland - For the superstructure formwork as well as the shoring construction consisting of the MULTIPROP system and ST 100 stacking towers, only system components were used.

Traffic junction Siekierkowska roadway, Poland

PERI superstructure formwork for reinforced concrete bridge

Warsaw, Poland

Øresund Link, Denmark–Sweden - One of the two production lines with the formwork assemblies reaching a total weight of 1,150 t. Here the internal formwork has been retracted into the reinforcement cage.

Øresund Link, Denmark

PERI forming machine for world's largest monolithic tunnel

Copenhagen, Denmark